Explore Our Best-Selling Metal Buildings

Trusted by Businesses and Homeowners, our best-sellers offer strength, affordability, and versatility. From cost-efficient gable structures to hassle-free carports and storage sheds, get a customized solution today!

40x80x18ft
Metal Building 🡢

Type: Gable
Lead Time: 5-7 Weeks
Fire-Resistant, Snow-Ready

40x60x16ft
Metal Building 🡢

Type: Gable
Lead Time: 5-7 Weeks
Fire-Resistant, Snow-Ready

30x50x12ft
Metal Building 🡢

Type: Gable
Lead Time: 5-7 Weeks
Fire-Resistant, Snow-Ready

20x30x14ft
Metal Building 🡢

Type: Gable
Lead Time: 5-7 Weeks
Fire-Resistant, Snow-Ready

10x12x10ft
Storage Shed 🡢

Type: Gable
Lead Time: 5-7 Weeks
Fire-Resistant

30x40x16ft
Metal Building 🡢

Type: Single Slope
Lead Time: 5-7 Weeks
Fire-Resistant, Ideal For Dry Climates

10x12x10ft
Carport 🡢

Type: Single Slope
Lead Time: 5-7 Weeks
Fire-Resistant

10x10x10ft
Storage Shed 🡢

Type: Gable
Lead Time: 5-7 Weeks
Fire-Resistant, No Permit Needed​ (Under 120 sq ft)

 

Design Your Own Metal Building.
We Will Manufacture and Deliver.

We provide tailored metal building solutions designed to fit your specific needs. Customize your building with flexible sizes, engineering, and finishes—all built for strength and durability. With industry-leading lead times, we manufacture and deliver directly to your job site.

 
Need Help? Our Metal Building Experts Are Ready to Guide You!
No Permit Required With Buildings Under 120 sq ft!
TALK TO AN EXPERT

Get A Customized Quote Today

Customize Your Metal Building & Request a Free Quote Today

QUOTE DETAILS

Please fill out the form below with all details

Quote Validity

Quotes remain valid for 7 Days

Response Time

Response time on quote request is 24-Hours


Over 40 Years of Experience in Better Building Solutions

Thousands of Projects Completed

 

Our Customers Speak For Us

Frequently Asked Questions

  • In most locations, any building under 120 sq ft. does not require a permit, making it an easy and hassle-free solution for storage sheds, carports, and small workspaces. However, building codes and regulations can vary by state and county, so we always recommend checking with your local permitting office to confirm specific requirements.

  • Our streamlined manufacturing process ensures that your custom steel building is ready in just 5-7 weeks from order confirmation. Lead times may vary slightly depending on customization, engineering requirements, or seasonal demand, but we strive to deliver as quickly as possible. Need your building sooner? Contact our team to discuss availability and expedited options.

  • The preliminary quote covers the building’s components.

  • Metroll US does not provide direct installation services. However, we can connect you with third-party contractors who specialize in building installation.

  • You’ll need to manage the permitting process yourself, but we provide stamped engineering plans to support your application.

  • We partner with trusted insulation companies that provide and ship insulation directly to your jobsite.

    1. Design Consultation: Schedule a complimentary design meeting with one of our experts. We’ll discuss your design preferences, including the number and location of roll-up doors, personnel doors, windows, mezzanines, overhangs, gutters, and wainscots. 

    2. Design Approval: Select your desired colors and review the final design. We’ll provide a firm quote that includes engineering plans and delivery to your jobsite. 

    3. Order Confirmation: Once you sign off on the quote and submit a deposit, we’ll begin the engineering process. Drawings and calculations will be sent to you within 5 business days. 

    4. Fabrication: After receiving your payment, we’ll start fabrication, which typically takes 5-7 weeks. 

    5. Delivery: Once the remaining balance is paid, we’ll schedule delivery to your specified jobsite

  • Yes, you can pick up your building from our factory in Fontana, CA. Let your building design expert know if you’d like to arrange a pickup.

  • We do not offer financing options. We recommend reaching out to local lenders or financial institutions for financing solutions.

  • No, engineering plans and foundation estimates are included in the firm quote.

  • You’ll need to have a forklift and an operator on-site to offload the materials.

  • You have two weeks after receiving your materials to report any missing or damaged items. We’re committed to resolving issues promptly to ensure your satisfaction.

    1. We offer pass-through warranties from our trusted suppliers: 

    Duracoat Paint Warranty: 40-year warranty on paint from our supplier, Duracoat, ensuring long-lasting protection and color retention. 

    Steelscape Material Assurance: Our steel is sourced from Steelscape, which guarantees compliance with mill specifications for high-quality steel.

    Engineering Certifications: Our engineering firms provide certified plans that meet all relevant codes and structural load requirements, ensuring the safety and integrity of your building.